About the system

Cable fire protection in Kyiv and Ukraine

We work with cable routes and penetration seals after confirming cable composition, fill level and project requirements.

KABO GROUP reviews the available information, prepares an agreed technical scope and completes the work with the defined documentation.

Solutions

What is included in cable fire protection

Practical guide

System details and solution selection

How the solution is selected

We assess the building use, protected area, fire risks, existing engineering services and the required performance before agreeing the technical solution.

What affects scope and cost

The estimate reflects system size, equipment or materials, access conditions, interfaces, commissioning and the completion documents agreed for the project.

From survey to handover

KABO GROUP can survey, design, supply, install, test and hand over the system, followed by planned maintenance where required.

Quality control and handover

During application we record material batches, substrate preparation, ambient conditions, consumption and intermediate measurements. Coatings are checked for thickness, continuity and adhesion; boards and penetration seals are checked as complete tested assemblies.

Handover may include work records, concealed-work records, area drawings, inspection protocols, material documentation and maintenance guidance. The exact package is agreed in the contract and design.

Cable routes and fire-stopping penetrations

Cable coating and penetration fire stopping are different functions. A cable coating limits flame spread along the route; a penetration seal restores the fire resistance of the wall or floor around services.

For each penetration we record barrier type, opening size, cable composition, tray, required class and future reserve. The complete tested configuration is reproduced with the specified depths, spacing and materials.

Labelling and change control

Completed penetrations are labelled and entered in a location register. Future cable changes can then be checked and the seal reinstated without compromising performance.

Cable coatings are selected with regard to access, tray fill, loading and thermal conditions. They must not be incompatible with cable sheathing or prevent routine maintenance.

Regulatory basis

Regulations and standards considered

This list explains the regulatory basis but is not a substitute for a project or a complete schedule for every building. Document status, amendments and building-specific requirements are verified when the project starts.

AMMOKOTE / VIDEO

See passive fire protection in action

Official manufacturer videos demonstrate preparation, installation and material behaviour under flame exposure.

All channel videos
Fire test

Вогнезахисна фарба для кабелів Ammokote MF-180

Application, flame exposure on protected and unprotected cables, and the test result.

Open on YouTube
Installation method

Універсальна кабельна проходка Ammokote SCS-K

System components and the installation sequence for a fire-resistant cable penetration.

Open on YouTube

Videos are provided by the official Ammokote fire-protection materials channel. The project defines the applicable system and coating thickness.

Outcome

One accountable delivery cycle

Survey of cable routesSelection of materialsApplication and identificationPhoto records and completion documents
Process

Work stages

Project information

We receive drawings, specifications, fire-resistance requirements and available information about the site.

Site survey

We verify the actual condition, geometry, access and preparation requirements.

Technical solution

We select a compatible fireproofing system and define the required scope.

Estimate and schedule

We agree materials, quantities, site conditions, responsibilities and timing.

FAQ

Common questions

Can work be carried out in an operating facility?+

Yes. Access, permits and working hours are agreed before work starts.

How does the work begin?+

We start with the available information, a site survey and an agreed technical brief.

What determines the cost?+

Cost depends on floor area, building configuration, system scope, access conditions and the required completion documents.